Breakdown

What a website costs in Ukraine in 2026

The honest short answer: from nothing to a few thousand dollars, and that is not evasion — it is the state of the market. You can build a site yourself on a builder in an evening. A landing page from me is from $500 in 7–14 days. A corporate site from a studio starts at 30,000 UAH and takes 21–35 days. Below is what you actually pay for in each case.

OptionCostTimelineWho it suits
Build it yourself
Tilda, Wix, Google Sites
builder subscription + domainan evening – 3 daystesting an idea while there is no traffic and no budget
A freelancer
from a template to custom work
the widest spread on the market: from a few thousand hryvnia for a template up to studio-level sumsfrom a few daysyou need a specific result and can run the process yourself
A web studio
manager, designer, developer
business card site from 15,000 UAH
corporate from 30,000 UAH
complex from 50,000 UAH
14–35 days and upa large scope, several departments, a team is needed
An all-in-one developer
one person builds the site and runs the ads
landing page from $500
site + ads from $750
7–14 daysyou need enquiries, not just a page on the internet

The studio figures come from the published 2026 price list of the Ukrainian web studio Webscraft (source), as does the freelance range. The dollar prices are mine; they are on the Pricing page and do not move with the exchange rate.

Why does one site cost 5,000 UAH and another 50,000?

Because the word «website» covers at least three different things: a business card page, a page built for advertising, and a system with a catalogue, a customer account and payments. The difference between them is not percentages, it is multiples.

Five things actually drive the price: how many pages and blocks, who writes the copy and supplies the photos, which integrations are needed (Telegram bot, CRM, payments, booking), how many languages, and whether there are custom blocks — a calculator, a parameter-based selector, an interactive catalogue. More detail with examples is on the Pricing page.

What is almost never included in the quoted price?

  • The domain — roughly $10–15 a year, registered in your name.
  • Hosting — for an ordinary site this is the free Netlify or Cloudflare plan, but it is worth saying out loud before you start.
  • Photography — if you have no photos of your own, that is separate work or a paid stock library.
  • Copy — for some providers «turnkey website» means building from the text you supply.
  • The ad budget — that is money for the platform, not for the contractor. If a proposal merges budget and work into one figure, ask where the line is.
  • Payment processing — the bank's percentage on online payments in a shop.

Normal practice is for all of this to be named before payment, not to surface at launch.

When is a website builder enough, and when is it not?

It is enough when you are testing an idea, you have one service, no advertising and no time. A page on Tilda built in an evening is a perfectly reasonable first step, and I tell clients so directly.

It is not enough once one of three things appears: paid traffic (builders are heavier, and every extra second of load time costs enquiries), several languages, or integrations — a bot, booking, a customer account, a custom selector. That is when the builder starts to get in the way, and the site has to be rebuilt with the ads already on pause.

How long does development take?

With me it is 7–14 days from brief to launch: a day for the brief, 1–2 for structure and design, 4–8 for development, 1–2 for launch. Studios publish 14–21 days for a business card site and 21–35 for a corporate one.

The difference is not typing speed, it is the number of approvals: where a team works with a manager, every step passes through several people.

How do you avoid overpaying?

  1. Ask what is actually included — copy, photos, responsive layout, the form, analytics. «Turnkey» means different things to different people.
  2. Ask for live links to past work, not pictures. The site should open on a phone and work.
  3. Check where the enquiry lands and who holds the access. The domain and the ad account must be registered in your name.
  4. Do not pay for pages nobody needs. Ten «about us» sections add no enquiries.
  5. Ask for a first-screen draft first. It shows whether the contractor understood your business at all. With me that is free and commits you to nothing.

What does it cost to keep a site running after launch?

For an ordinary site, next to nothing: it lives on Netlify or Cloudflare, and at that volume the plan is free. What remains is the domain, roughly $10–15 a year.

Paid territory starts where traffic is genuinely large or external services are needed — a paid AI model instead of a free tier, for example. I say such things before the start, not after.

A site first, or a site with advertising straight away?

If the traffic is going to be paid — together. The all-in-one package is from $750, which is cheaper than the sum of separate jobs, but the real point is not the money: the pixel and the events are in place before launch, and the page is written around the same promise the ad makes.

The most common reason a budget is wasted is that one person built the site, another runs the ads, and neither saw the other's work.

Get your own number

Tell me what you do and what you need. I will come back with a specific figure and timeline, and the first-screen structure draft is free — before any commitment.

Updated 17 October 2026 · Serhii Husiev, husiev.pro